Project Name: Shahin

Project Name: ShahinStatus: Executed

Project Name: Shahin
Status: Executed
Scope: Design and execution of the reinforcement operation and stabilization of the cavity walls
Contract Issue: Design and execution of the nailing for the purpose of the trenches stabilization
Stabilization Method: Combination of nailing, anchorage, meshing, shotcrete, drainage and piling through self-supporting nails (R51N: 1855 m2)

 

Geotechnical Design and Solution Ground Improvement Deep Foundation Earth Retention Grouting Technology Injection System Excavation and Stablization Seepage Control Slope Stabilisation Rapid Impact Compaction Deep Soil Mixing Micropile Shotcrete Anchor and Soil Nail Diaphragm Wall Secant Piles Wall Deep Dynamic Compaction Rock fall and avalanche Barrier Sheet pile wall